Ditch the heavy workbooks and glorified answer-key apps.
ISEE Coach uses evidence-based research, targeted analytics, and AI to help your child master the test.
15 minutes, no sign-up. See the questions, ISEE Coach explanations, and Similar Problems.
$149 for 90 days.
Free forever with no credit card. We don't do auto-renewal.
The Problem
Right now, the ISEE prep market forces you into a corner:
There has to be a better way.
When I first navigated the ISEE prep market for my own children, I was struck by how confusing and limited the options were. I quickly realized that the ISEE isn't just a review of what kids are learning in school. It tests concepts years beyond their current grade level. An 8th grader is suddenly staring at 11th-grade geometry, and a 5th grader is asked to calculate slopes and find the synonym of words like benevolent.
Yet the solutions available were disconnected from our reality. Between regular schoolwork, extracurriculars, and our own full-time jobs, our days were already packed. What I found instead were outdated paper workbooks on Amazon that required flipping to the back for a letter answer with no explanation. Static quiz websites that just spit out "number correct" and left us to figure out what my child actually knew or not. Mysterious tutoring services with zero transparency that required a "consultation" only to charge upwards of $150 an hour.
As a parent, I felt underwhelmed by the options and overwhelmed by how we were going to actually prepare. As a scientist, I knew there had to be a better way.
I built ISEE Coach to be the platform I wished existed for my own family. Your time is limited, and test prep shouldn't take over your life. We designed a system that makes every minute count:
We didn't just build a modern alternative to traditional test prep. We built a scientifically smarter way to learn.
P.S. ISEE Coach is early and evolving. I read every piece of feedback personally, so if something's broken, unclear, or could be better, please email me at info@iseecoach.com. I want to hear from you.
Best, Dara Founder, ISEE Coach
Our Approach
ISEE Coach is built for the ISEE, a test that looks and feels different from the tests most students are used to. The ISEE has its own question types (synonyms, sentence completions, quantitative comparisons), no calculator on the math, a 30-minute essay, and short scheduled breaks between sections. Our approach is grounded in rigorous, evidence-based research to give your child's prep time the highest return.
Behavioral science shows that 15 minutes of focused practice beats a 3-hour weekend cram session (Cepeda et al., 2006). Our analytics track exactly where your child struggles, so they can spend their time mastering weak spots instead of repeating what they already know (Kulik & Fletcher, 2016).
When your kid gets a question wrong, they can tap for a walkthrough that explains why the trap answer was tempting and how to actually solve it. Every question in the bank gets the same treatment (Booth et al., 2013). No more digging to the back of a workbook for a one-line answer key.
Pacing trips up a lot of kids on the ISEE. They know the material but run out of time. Our practice sections use the real ISEE time limits, so your student figures out their pace during practice instead of on test day (Powers & Rock, 1999).
The ISEE runs about 2h 30m for Lower and 2h 40m for Middle and Upper. That's a lot of focus for a student to sustain in one sitting, and full-length timed practice tests are how they build up to it.
How do you actually know your kid understood a concept versus just memorizing the answer? When your child misses a question, ISEE Coach generates a fresh, structurally similar problem on the spot. If they get the follow-up right, you know it stuck (Adesope et al., 2017).
What you get
Miss a question and ISEE Coach shows why the trap answer was tempting and how to actually solve it, then hands your child a fresh problem on the same skill.
Every practice essay comes back with a rubric grade on Ideas, Organization, Voice, and Conventions, what your child did well, and example sentences that show exactly what to try next.
See how your child's pace compares to the target for each section, which skills they rush and which ones slow them down, and a short list of what to try on the next test.
A section-by-section report across every full practice test: questions correct, estimated scaled score, stanine, and percentile, and each subskill, with the change since the first test.
Sample views shown with example data.
Pricing
| Free | Full Access · $149 / 90 days | |
|---|---|---|
| Sign-up cost | Free forever | $149 one-time |
| Practice questions at your level | Starter set + 3 practice setsA 15-minute starter set with no sign-up, then 3 practice sets you choose. Essay practice stays open. | Full bankEvery question in the ISEE Coach bank at your child's level. |
| Timed section practice | Counts toward your 3 setsPractice any section (Verbal, Quant, Reading, or Math) under its ISEE time limit. | All 4 sectionsPractice any section (Verbal, Quant, Reading, or Math) under its real ISEE time limit, with unlimited attempts. |
| Static answer explanations | UnlimitedWritten walkthrough for every question showing why the correct answer is correct. | UnlimitedWritten walkthrough for every question showing why the correct answer is correct. |
| ISEE Coach explanations | 5 total (lifetime trial)Personalized AI explanation on what your child got wrong and why. | UnlimitedPersonalized AI explanation on what your child got wrong and why. |
| Similar-problem generator | Try one in the starter set | UnlimitedAfter each miss, the AI creates a fresh problem on the same skill, so you know the concept stuck, not just the answer. |
| AI essay grading | 1 grade (with diagnostic)A rubric-based AI grade across Ideas, Organization, Voice, and Conventions, included with your diagnostic. | Up to 20 grades / 90-day accessRubric-based AI feedback across the 4 dimensions independent-school readers focus on. Level-adapted (Lower / Middle / Upper). Grades are for tracking prep progress only. The real ISEE essay is not scored. |
| Full timed practice tests | 1 diagnostic testComplete 4-section + essay ISEE simulation, timed like the real test. | All 3 testsComplete 4-section + essay ISEE simulations, timed like the real test. |
| Kid profiles | 1 child | Up to 4 childrenSeparate profile per child, so siblings' progress and analytics don't mix. |
| Progress analytics | Basic trackingAccuracy and question counts. | Full analytics with focus recommendationsPer-subskill breakdown of accuracy, pacing, and what to focus on next. |
| Cross-device sync | IncludedPractice on a laptop, phone, or tablet; progress follows the account. | IncludedPractice on a laptop, phone, or tablet; progress follows the account. |
Tutors and schools: group discounts are available. Email info@iseecoach.com to learn more.
Prep by level
Test structure plus a curriculum-gap analysis for 4th and 5th graders.
Read the prep guide →Test structure plus a curriculum-gap analysis for 6th and 7th graders.
Read the prep guide →Test structure plus a curriculum-gap analysis for 8th, 9th, and 10th graders.
Read the prep guide →Sign up with your email or Google in 30 seconds. No credit card required.
Create a separate profile for each child. Pick their level (Lower, Middle, or Upper) and filter to the topics they need to work on.
Take a section, a full timed test, or focus on a single topic. Every wrong answer opens an explanation.
Signing up is free. Buy access from inside the app once you're ready.
Sign in with a one-click email link or with your password.
New here? Start with the email link. Once you're signed in, you can add a password so another parent or caregiver can sign in on their own computer.
By signing in, you agree to our Terms of Service and Privacy Policy. Your kids share this account, so you'll pick their profile after signing in. The email link expires in 1 hour and only works on this device.
Common Questions
Two testing windows. In-person testing at ISEE test centers runs August through February on set dates. Remote-proctored at-home testing runs year-round with far more scheduling flexibility. Most private-school applications close between December and February, so most families aim for a test date about 6 to 8 weeks before their earliest deadline.
Students may take the ISEE once per testing season. There are three seasons in each 12-month admission cycle:
Most families schedule one attempt in the season that lines up with their application deadlines, and hold a second season in reserve as a retake option if needed.
Both formats use the same test content and scoring. The choice usually comes down to your child's testing style and your logistics.
In-person at an ISEE test center is best for kids who focus better in a structured, quiet room away from home and household distractions. Set dates, less flexibility, but nothing to set up on your end.
At-home remote-proctored testing is best for families who want scheduling flexibility, live far from a test center, or have a child who tests better in familiar surroundings. You'll need a reliable computer with webcam and mic, a quiet room, and a stable internet connection. A live proctor watches the entire test through the webcam.
Both formats are digital. Some in-person centers still offer paper-based, but on a very limited schedule. Since almost every student now tests digitally, ISEE Coach is browser-based so your kid practices in the exact format they'll see on test day.
Registration is through E3n, the nonprofit that provides the ISEE: ISEE registration at admission.org. As of the current admission cycle, the base test fee is around $150 (in-person or at-home; the fee is the same). Some families qualify for a reduced fee; check the registration site for the current fee-waiver criteria.
Your registration includes score reports sent directly to the schools you designate on your ISEE account. Additional score reports and rush scoring cost extra. All exact fees are on the registration site since they update yearly.
Buy another 90 days. If your access is still active when you buy again, the new 90 days get added on top of your remaining time. You don't lose any days by renewing early.
Payments run through Stripe, the same processor Shopify and Notion use, so we never see or store your card number. Your child's practice data (name, level, attempts, progress) stays private to your account. We don't sell it, share it with advertisers, or hand it to outside AI companies for training.
This is the most common gap we see, and it is not a practice problem. It is a content problem. A 4th grader sitting the Lower Level, or a 6th grader sitting the Middle Level, is tested on material the older kids in their band have already been taught in school. Giving a child practice questions on a concept they have never been taught just teaches them that math is scary.
So we built the fix, and we made it free: Numbercade. It is an arcade of eight browser games that teach the concepts (lessons first, then challenges) rather than just quizzing them: fractions and fraction operations, ratios and percents, order of operations, solving and setting up equations, slope, geometry, roots and exponents, and probability. Between them they cover the math concepts needed for the ISEE Lower and Middle levels. Upper Level content is coming.
No sign-up, no ads, no cost, nothing to install: it runs in a browser and saves progress on the device. If your child hits a wall on a topic here, send them to Numbercade to learn it, then come back and practice it in test format.
No. Actual ISEE questions are copyrighted and can't be reproduced anywhere. Every question in ISEE Coach is original content, written to closely mirror the ISEE in question type, topic coverage, difficulty, and format. Your kid should walk into the real test recognizing the structure of every question type they see.
No. ISEE Coach is an independent study tool. The ISEE is provided by E3n, the nonprofit formed in March 2026 when ERB and EMA merged, and ISEE Coach is not affiliated with, endorsed by, or sponsored by E3n.
There is overlap as both are admission tests for independent and private schools. But the SSAT is a distinct test with its own format: it uses analogies (the ISEE doesn't), it has two Quantitative sections instead of the ISEE's Quantitative Reasoning and Mathematics Achievement. A critical difference is SSAT subtracts a quarter point for a wrong answer, whereas ISEE does not penalize wrong answers. If your child is preparing for the SSAT, we built a separate tool purpose-made for it: SSAT Coach at ssatcoach.com.
Every claim in the differentiators above is grounded in learning-science research from psychology and education, with a bias toward randomized experiments and large meta-analyses. Here's the primary evidence behind our four biggest claims:
🎯 Targeted practice. Cepeda, Pashler, Vul, Wixted, & Rohrer (2006). Distributed practice in verbal recall tasks: A review and quantitative synthesis. Psychological Bulletin, 132(3), 354 to 380. Meta-analysis of 317 experiments on the spacing effect. Kulik & Fletcher (2016). Effectiveness of intelligent tutoring systems: A meta-analytic review. Review of Educational Research, 86(1), 42 to 78. Meta of 50 controlled studies of analytics-driven adaptive tutoring.
📖 Walkthroughs. Booth, Lange, Koedinger, & Newton (2013). Using example problems to improve student learning in algebra: Differentiating between correct and incorrect examples. Learning and Instruction, 25, 24-34. Classroom RCT on worked examples with error explanations.
⏱️ Pacing. Powers & Rock (1999). Effects of coaching on SAT I: Reasoning test scores. Journal of Educational Measurement, 36(2), 93 to 118. Quasi-experimental study of 4,200 SAT-takers; timed simulation practice was a measurable active ingredient in score gains.
🔁 Proof of Mastery. Adesope, Trevisan, & Sundararajan (2017). Rethinking the use of tests: A meta-analysis of practice testing. Review of Educational Research, 87(3), 659 to 701. Meta-analysis of 118 randomized experiments; applying a concept to a fresh problem immediately after learning it produces substantially better transfer than restudying.
It's built on the retrieval-with-transfer literature (see the research FAQ above). "Similar" here is what cognitive scientists call an isomorphic problem: it looks different on the surface (different numbers, different scenario) but requires the same underlying logic to solve. When a student gets a question wrong, reads the walkthrough, and is then handed a fresh isomorphic problem, they can't shortcut by remembering the original answer. They have to actually apply the concept to a new scenario. That kind of transfer is what makes learning stick long-term.
Email info@iseecoach.com with bug reports, feature ideas, or feedback on your kid's experience. It goes to a real person, not a support-ticket queue, and every message is appreciated and read.
Upgrade for unlimited ISEE Coach explanations, similar-problem practice, and full tests.
At least 8 characters.
If your tutor or school gave you a code, enter it here to unlock Full Access for 90 days. If you already have Full Access, the 90 days are added on.
One code per student. Each code gives 90 days of Full Access, starting when a family redeems it. Codes can be used for 12 months.
Send one code to each family. A family enters it with Have a code? at the top of the app.
Each child has their own profile, practice history, and progress.
Free accounts include one profile at the level you choose. Full Access adds room for additional kids and lets you switch levels later.
We found practice profiles saved on this browser. Importing creates them under your account so they sync across devices.
Your existing browser data stays exactly where it is — this is a copy. Practice attempts will move in the next update.
Choose what you'd like to practice today.
Practice one section at a time with the real question count and time limits and no timer.
Practice one verbal skill at a time (synonyms or sentence completion) with a 15-minute timer.
Short, spaced practice beats cramming for long-term retention — Cepeda et al. (2006) meta-analysis of 254 studies.
Pick a genre and read two random passages — matches how real ISEE Reading Comprehension groups its selections, with a 15-minute timer.
Short, spaced practice beats cramming for long-term retention — Cepeda et al. (2006) meta-analysis of 254 studies.
Practice one math topic at a time, with questions from both the Quantitative Reasoning and Mathematics Achievement banks and a 15-minute timer.
Short, spaced practice beats cramming for long-term retention — Cepeda et al. (2006) meta-analysis of 254 studies.
Practice just the 30-minute essay with a fresh prompt. Your writing is saved to your history.
Complete simulation: all 4 sections + essay with 5-minute breaks, timed exactly like the real ISEE.
Take a short break. Stand up, stretch, get some water.